https://drive.google.com/file/d/166Vo64vXETmpojEYY90jb5MnkFF9xhye/view?usp=drive_link
In this episode of Storman Norman Presents, we are tackling the strict chronological requirements for filing statutory plans in BC.
Precision in dating is a professional responsibility. This episode clarifies the two critical dates required on every legal plan and why misrepresenting them can lead to a disciplinary inquiry.
Key Study Points
Date of Survey: Represents the final day field observations and monumentation were completed.
Date of Plan: Represents the day the plan was finalized and signed in the office.
The "Gap" Period: Professional risks associated with a long delay between the field survey and the plan filing.
Statutory Compliance: Ensuring the survey reflects the legal state of the registry as of the survey date.
Infographic:
https://drive.google.com/file/d/1hUw42p8GgdNODMwKLJwgJJEhcQ2oKYBA/view?usp=drive_link