Listen

Description

Today on the cast, my brother and I are out working in the garage.

This is from December 3rd. Since the last garage episode, most all of the first pass of junk removal has been completed. Now the area near the wall on the outer side is all clear, and we're putting R-13 insulation in between the wall studs. Because the house is older than modern standards the studs are all unevenly spaced, and there's a lot of us needing to cut the batts from their default size down to the size for each wall segment.

As I said, this was recorded a little while ago, and we've since completed the full wall. There's some pics of it on Instagram, if you wanna see.

Also, you can all thank Brett from the Skeleton House Podcast for encouraging me to put out this recording as soon as possible.