Every construction estimate makes assumptions about people: how rested they are, how long they’ll stay, and who’s actually running the job. Nobody writes those assumptions down, so nobody prices them, and ops wears the variance when they don’t hold. Drawing on his years as a Chief Estimator and P&L leader, Angelo breaks down the overtime tax, the churn tax and the trust gap between estimating and operations. He closes with three practical moves any contractor can make on the next bid, no software required.

Key topics

• How a labour number really gets built, and why every factor describes the building, not the people

• Why historical productivity data hides the human variables instead of capturing them

• The overtime tax: MCAA factors for 50- and 60-hour weeks, and the “61 cents” reality

• Fatigue data from the National Safety Council (2018)

• The churn tax: absenteeism, turnover and the value of craft training

• The month-six cost review, and why psychological safety is a margin issue

• Three moves: write down the human assumptions, price acceleration honestly, close the loop