One of the main challenges in leading a big team is that nothing ever seems to finish—there’s always more to building a team. Even at milestones, one looks ahead and sees more work to do. In the first few months I had been working on Windows so far, we re-organized the team in a huge way and shipped Windows Vista, only to then have to figure out how to plan a product release with this entirely new organization, while building an improved engineering culture. The planning work began in earnest in December 2006 and concluded July 2007. This is the story of those months and what it was like and what management tools we used to develop a product plan for what would become Windows 7.

Back to 087. Reorg! Why Are We Together, Exactly?

SteveB loved to talk about his discussions with engineers as he tried to better understand the company’s execution and culture challenges. He would say “I talked to this engineer on the team, and they told me ‘Look, everything is completely screwed up and everybody telling you how to fix it is wrong.’” Steve would continue to listen to a litany of problems and why everyone was being “dumb” wondering what he could possibly do. Then the engineer would look up and say to Steve, “But I [emphasis on “I”] know exactly what to do and how to fix it.”

My problem was I was also that engineer. I saw the problems and “knew” what to do. Except it was my job and I had to lead the team to fix the problems.

Fortunately, early on there was a set of like-minded engineers who were willing to sign up and take on the challenge of building a culture and now a plan for what comes next. From the very start it was not just me driving the cultural changes, but the set of leaders put in place from our big re-org.

Change across thousands of people, each of whom knows exactly what should be changed, is not a one-time event. Change takes repetition. It takes calendar time. It takes making some mistakes and using those as learning or teaching moments. While everyone was anxious for change, thousands of engineers must be given time to think and reach the point—on their own—of agreeing to a certain kind of change.

Every step over the next few months, from the time of putting an organization in place to starting the real building of products, we (the leaders) would be confronted with two realities. First, we had to remind everyone on the team consistently and repeatedly of the process we were using and how we aimed to work together. Every. Single. Communication. At times it felt like we were reading the inside of the box of a board game at every meeting. Second, every time we made a mistake and didn’t ourselves follow that process, expect someone to point that out and for that to become a moment of humility.

It was a constant push-pull with so many wanting to know what we were telling people to build while we were busy pushing back and saying how we needed them to figure that out. At the same time what we wanted to do would look radically different from the past. It wasn’t a top-down plan. It wasn’t a disconnected set of innovations. It was not about consensus of design as in design-by-committee, but a coherence of a plan. The investments (as we would say) were going to fit together into a holistic product plan across our new organization: WEX, LEX, IE, and COSD. After every step in the process, we regrouped as a leadership team and not only talked about what parts of the process we needed to improve, but we turned that into coaching and more outbound communication such as my Office Hours blog. At the same time, we were continuously adapting to what was understood, misunderstood, and especially challenged when it came to process.

An example of cultural change that was front and center was a desire to match the old Windows team in terms of scorecards or KPIs by automating or operationalizing key requirements. I would be out there talking about vision and scenarios and collaboration—abstract concepts that need to be made concrete by the team—only to find out some people were trying to make a vision scorecard or building an automated testing tool to check if scenarios were complete or tools to red/yellow/green dependencies between different teams. We’d come across this and then would need to course correct and talk about how accountability works without constant monitoring by others nor overwhelming bureaucracy.

Every email and memo, every team meeting, every 1:1 was a not just an opportunity to reinforce the new cultural norms, but a requirement for us to do so. The first and most important test was developing a product plan for the next release following Vista. For us to get to the finish line with a coherent product all at the same time and all on time we would need to get to the starting line at the same time.

First, we needed a product name. By now you know I was never a fan of codenames.

Windows had always had somewhat clever (too clever) code names with layers of meaning. As a consumer of these code names, they neither made for secrecy, as one could routinely read about the release code names in trade press, nor did they make it easy to remember what someone was talking about. “Is that in Nashville or Memphis? I can’t remember.”

Windows Vista was the sixth major release of Windows and it was version 6.0.6000 for techies. So, by fiat I christened the code name of the release Windows 7. I thought I was being the opposite of clever and we could simply move on, as we had done when we picked Office 9. Oops. Immediately I made two mistakes. First, did I reach consensus on this name? Second, did I even understand the ramifications of the name I picked unilaterally?

This sparked a debate that only geeks would participate in (at the time and once the name was made public), which was: How did we count versions of Windows? Technically, this was not the seventh major version, as some would debate. My view: Windows 1.0, Windows 2.x, Windows 3.x, Windows 95, Windows XP, and Windows Vista. But wait, there was Windows NT, and there was Windows 98, 98SE, and Millennium edition.

It turned out there were lots of ways to count and lots of ways to have more than six previous releases or fewer than six. Essentially, everyone could be right. I probably received two dozen emails with different algorithms for counting how many releases of Windows had been done, ranging from “well, it was really only four” to “at least a dozen.”

I stuck with seven.

Crisis averted by executive authority. Temporarily.

The test and engineering system team informed me that we could not possibly “bump the major version number,” as this would cause a whole slew of problems for application compatibility. It turned out many existing Windows programs were bad at checking what version of Windows was running and failed to run if the “major version” (that would be the first digit) was incremented. I knew this from Office 95 when we skipped several version numbers to align all the apps.

Marketing had input too: that we had to make it version 7.0 because if not the press would think we were doing a minor version and then enterprise customers would not see the need to upgrade. So even though the engineering system did not want the major version number changed, the marketing team did.

This whole notion of “major” versus “minor” as the press characterized releases would drive me nuts. It seemed as though a major release was one that broke a lot of stuff and finished late. A minor release was one that worked because it polished features and finished on time. My view, no surprise, would be based on resources. Did we have everyone working on the release or did w…



This is a public episode. If you would like to discuss this with other subscribers or get access to bonus episodes, visit hardcoresoftware.learningbyshipping.com