This was recorded in June 2018 on the Lower Mall path under Hammersmith Bridge, London, during a busy time for pedestrian traffic; this was less than a year before the bridge completely closed for extensive repairs.
Recorded by Toby Kaufmann-Buhler.
Want to check another podcast?
Enter the RSS feed of a podcast, and see all of their public statistics.