Listen

Description

Most projects don't fail in the field they fail before boots ever hit the site. In this episode, Jason walks through the builder's pre-construction game plan for "winning the war before going to battle," from strategy and flow to procurement, team setup, and workforce support. If you want a job that runs with clarity instead of chaos, this is the checklist-style breakdown of what to design, buy out, and align before Notice to Proceed.

WHAT YOU'LL LEARN IN THIS EPISODE:

·       Why planning is the real "battle," and how most teams lose before construction even starts

·       How a morning routine (and box breathing) supports focus so you can actually execute your systems

·       What "anchor projects" are and why your best people should learn from them and replicate the model

·       The first-planner steps: project strategy, constraints, contract requirements, flow, and sequencing maps

·       Why Takt planning belongs before CPM/P6/Microsoft Project and how it protects trade flow

·       How a day-to-day geographic logistics analysis reveals the real production limits on tight sites

·       The WBS → sequence → logic-tie approach that prevents "compressing the schedule to fit a date"

·       How to identify bottlenecks and stabilize throughput instead of speeding up random activities

·       Building procurement into the plan early especially exterior systems, elevators, and long-leads

·       How to build the team in pre-con: roles by geography, leader standard work, and team health systems

·       Designing trailers and office layouts for collaboration (so lean actually has a chance to work)

·       Workforce win strategies: bathrooms, lunchrooms, huddles, parking, water/ice, and making work fun

·       "Contracts and costs for culture": buying out the behaviors you want (LPS, JIT, coordination, BIM)

·       Schedule health essentials: right detail level, commissioning/startup, monthly health checks and risk

·       Risk prevention systems: basis of schedule, sequence maps, trade partner buy-in, fresh-eyes reviews

·       The baseline discipline: backups, reports, owner interface strategy, and weekly schedule updates

If you want remarkable performance in the field, you have to design the job people, logistics, culture, procurement, and flow in pre-con. Win the war first. Then go to battle.

 

  If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode.  And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).

Also, here are links to our YouTube Channels:

· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

 · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw