Jason introduces the concept of latency, the delay before action takes place, and explains why teams that decide or correct issues under 5 hours have dramatically higher success rates. Traditional project management (CPM) has only a 26% success rate with 21% failures, while Scrum/agile systems achieve 42% success with only 8% failures. The difference? Latency in seeing and acting on problems. A CPM expert called Jason to defend CPM, saying they noticed something felt wrong and caught it two months later via Power BI dashboards. Jason's response: "You just proved my point, with Takt or Scrum, you would have found that in days or hours, not months." Everything must be visual, bring problems to the surface immediately, show clearly what the problem is to everyone, and be easily understood, checked, actionable, fast, and reliable. Put scheduling systems in the hands of people at the place of work doing the actual work.

What you'll learn in this episode:

Reduce latency. See at the gemba. Decide under 5 hours. On we go.

 

  If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode.  And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).

Also, here are links to our YouTube Channels:

· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

 · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw