Jason in Baltimore hotel heading to project for scheduling. Principle 15 outpace entropy, must have systems correct problems fast enough to outpace natural chaos of project. Never been on project went badly, always pre-construction run well. Nine steps recover project: Stabilize site cleanliness organization safety, organize functional roles by area not scope, focus on contract work not change orders, map plan to finish with flow using takt, standardize meeting systems, discipline around cleanliness safety, fanatical roadblock removal, scrum non-timelined work, get help.
What you'll learn in this episode:
If don't know 100% you have control then you don't have control, you are in trouble.
If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw