Listen

Description

This is Episode 250, the perfect way to close out with the final section of "Elevating Construction Takt Planning." Katie narrates this last chapter covering when the plan changes, building a Takt plan from software to zones to trains, Takt phases from proposal through execution, running different project phases (foundations, superstructure, exterior, interiors, site work), the complete meeting system (strategic planning, trade partner tactical, foreman huddle, worker huddle, crew preparation huddle), the integrated control system, using Takt with Scrum and Last Planner, company controls and procurement, KPIs, Takt reflections, and the conclusion. Flow is the single biggest consideration when it comes to lean, everything starts with flow.

What you'll learn in this final section:

"Flow is the single biggest consideration when it comes to lean. We can go 5S, just-in-time deliveries, PDCA cycles, gemba, continuous improvement, they will never get us anywhere unless we have flow. Flow is everything in construction."

 

  If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode.  And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).

Also, here are links to our YouTube Channels:

· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

 · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw