Do you have too many things going on on your project at one time? Should you limit your work in progress? In this flow series episode, Jason unpacks why one-piece flow and limiting work in progress make you a ton of money, even though most superintendents resist these concepts. You'll learn the Tucson project recovery story (sent everyone home, got a plan, brought them back one by one in flow order), the envelope game demonstration (one-piece flow wins every time even though batching looks busier), examples of one-piece flow in construction and office work, the three types of buffers (inventory, capacity, time), why overproduction and excess inventory are the mother and father of all wastes, and when it's okay to get ahead vs when it's damaging.

What you'll learn in this episode:

"When a superintendent dispatches a trade partner into an area too soon, they stretch supervision, lose production, have less materials, more chaos, more quality problems, more materials in the way, costs go up, profits go down, using more unqualified people, everyone sandbags, areas get damaged sitting empty, team isn't focused on planning or removing roadblocks. That superintendent just created so much variation it's hard to recover from."

 

  If you like the Elevate Construction podcast, please subscribe for free, and you'll never miss an episode.  And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).

Also, here are links to our YouTube Channels:

· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

 · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw