If you're managing six different scheduling systems and it's taking forever to update them all, you're missing the integration that makes everything work. Jason just had the epiphany that changes everything. The work steps in Takt planning translate directly into your weekly work plan and your sprint backlog. That means you're not recreating plans over and over. You're pulling from a collaborative flow system that already has the production rates, the trade sequencing, and the make ready work packaged. Instead of spending hours populating weekly work plans from scratch, you're pulling pre-planned work steps based on formulas and flow. This is the magic formula that will save you one twelfth of the time managing your schedule.
What you'll learn in this episode:
The current condition is it takes way too long to do our schedules and short interval planning. Now that we know how to integrate these systems, it's time to go.
If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).
Also, here are links to our YouTube Channels:
· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg
· LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt
· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured
· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw