Listen

Description

The current industry approach is chaos. Workers do not see the planning. Foremen try to follow an uncollaborative dictated schedule or they ignore it completely. The famous Office fire drill episode shows what this looks like. People run around in different directions with false urgency. Deadlines are unnecessary or too late. Teams throw workers, money, materials at the project. It is like putting out a fire with one hundred dollar bills. Last Planner and Scrum are better. They introduce phase planning with pull planning. Make ready schedules identify roadblocks. Workers receive 50 percent of planned information. The integrated production control system with Takt is best. Workers receive 75 percent of planned information. Information flows through multiple paths, not a single point of failure through the foreman.

What you'll learn in this episode:

Workers see as much of the plan as possible and have input.

 

If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).

Also, here are links to our YouTube Channels:

· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

 · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw