Listen

Description

 

There is one real parameter when creating a Takt plan. Do not overburden the system. If more crews are needed, make sure the market has them. If materials are needed at expedited rate, make sure supply chain can accommodate. Research drawings before going to software. Builders who go straight to drawings are different from builders who go straight to software. The latter method puts things in the wrong order. Preliminary Takt zones in Phoenix for hospital space start at 10,000 square feet. Eventually they reduce to 3,000 to 7,000 square feet. Preliminary Takt time is usually 3, 5, 7, or 10 days. Five is most common because it represents one work week. Little's Law shows the power of smaller zones. Five floors with 5-day Takt equals 45 days total. Same project with 1-day Takt equals 29 days.

What you'll learn in this episode:

The difference with Takt is it is all downhill from here, whereas with CPM your nightmare is just beginning.

If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).

Also, here are links to our YouTube Channels:

· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

 · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw