Listen

Description

Jason continues the Takt production system series with interconnections, the interdependence ties that link phases into one overall plan. He explains how the shape of each phase shows how fast the train is going, why a Takt plan usually needs only five to 15 ties, and why seeing those handoffs matters more than the tangle of logic ties in a CPM schedule.

What you'll learn in this episode:

Can you point to the handoffs between phases in your schedule?

 

If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode.  And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).

Also, here are links to our YouTube Channels:

· Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg

 · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt

· LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured

· LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw