Connectologists® Kyle Murchie, Nikki Pillinger, and Philip Bale explore two modifications addressing network boundary charges—a barrier that has stifled countless projects. With both at consultation stage, developers and demand customers can shape how costs are allocated.
DCP461 has five options remaining after removing voltage-based rules. Approaches range from socialising costs through DUoS (Options 1.1/1.2), to Connection Asset Funding with or without capacity thresholds (Options 2.1/2.2), to clearer guidance on current practice (Option 3.1).
CMP460 initially considered three options before the proposer defined the proposal. The Original Proposal treats any shareable transmission asset at the network boundary as infrastructure, passing associated costs onto Transmission Network Use of System (TNUoS) charges. There is still time for alternatives to be raised with the consultation responses key, informing Working Group Members and triggering action.
The conversation explores how different options balance developer certainty, customer impact, and fairness—with particular focus on how identical projects face vastly different costs depending on substation classification, and how to prevent smaller customers being exposed to prohibitive SGT charges.
CMP460 consultation closes 18 February 2026; DCP461 opens second week of February for three weeks. The Connectologists® encourage responses—either directly or through trade bodies.
Read more:
DCP461: https://statics.teams.cdn.office.net/evergreen-assets/safelinks/2/atp-safelinks.html
Recorded 04 February 2026
Our links:
Website: https://roadnighttaylor.co.uk/
Newsletter sign up: https://roadnighttaylor.co.uk/newsletter/
Follow us on LinkedIn: https://www.linkedin.com/company/roadnight-taylor-ltd/
Find if we fit at info@roadnighttaylor.co.uk