In this podcast Ricardo Vargas talks about the main concepts involved in the earned value analysis. This podcast was recorded only in Brazilian Portuguese. The link below is for the Brazilian Portuguese version.
Want to check another podcast?
Enter the RSS feed of a podcast, and see all of their public statistics.