Exploring the site of an abandoned perfume factory in Zaire was the initial motivation to develop a 400 KVA hydroelectric plant in the highlands overlooking Lake Albert. During a ninth grade class field trip we did the feasibility study, learning more about potential and kinetic energy than can be taught in books. Boarding school activities at Rethy stimulated creativity.