Project delivery methods define who holds the contracts, who carries the risk, and how the architect's role changes on every construction project. This episode breaks down all six major methods so you know exactly how each one works.

Emily walks through Design-Bid-Build, Design-Build, Construction Manager at Risk (CMAR), Construction Manager as Agent (CMa), Multiple Prime, and Integrated Project Delivery (IPD).ย 

You'll learn why the architect works for the owner in some methods and for the contractor in others, what a GMP contract actually does, and how to match the right delivery method to a project scenario on the ARE.

This topic shows up on three different ARE exams and the CDT exam. If you invest the time to learn it now, it pays off on every exam you take.

๐Ÿ“ Key topics covered:

โฑ๏ธ Chapters:ย 

(0:00) What Are Project Delivery Methodsย 

(2:48) How Delivery Methods Hit the ARE

(4:39) Design-Bid-Build Explained

(6:16) DBB Pros and Cons

(7:22) Who Holds the Risk in DBB

(8:24) Design-Build Explained

(9:36) Architect's Role in Design-Build

(10:18) Fast-Tracking in Design-Build

(12:33) DB Pros and Cons

(13:32) Progressive Design-Build

(14:11) Design Assist and Bridging

(16:03) Construction Manager at Risk

(16:55) What Is a GMP Contract

(17:38) CMAR Phase Shift Explained

(19:54) CMAR Pros and Cons

(22:05) CM at Risk vs CM as Agent

(23:11) Construction Manager as Agent

(27:44) Multiple Prime Contracts

(30:28) Integrated Project Delivery (IPD)

(33:18) How to Choose a Delivery Method

(36:12) ARE Study Resources

๐Ÿ“– Read the full blog post

๐Ÿ“ Download the FREE Project Delivery Methods study notes

๐ŸŽฏ Get access to all ARE study materials with the ARE 101 Membership

๐ŸŽฏ Join our 10-week ARE Boot Camp

๐Ÿ“š Individual courses:

ย