AEMO’s head of system design Merryn York on the draft 2024 Integrated System Plan. Plus: The big NSW tender, and battery storage everywhere. And a few tips for 2024.
Want to check another podcast?
Enter the RSS feed of a podcast, and see all of their public statistics.