Utilities are drowning in paperwork long before a repair crew ever leaves the yard. Aarya Borele, co-founder and CTO of Evardi Energy, walks John and Bobby through outage requests getting rejected a day out, FERC 881 pushing line ratings from seasonal to hourly, and why 95 percent accuracy is a failing grade when the lights are on the line. Also in here: the grid as cloud infrastructure, Griddy's flameout, and a 49ers conspiracy theory involving a substation.
Click here to watch a video of this episode.
Join the conversation shaping the future of energy.
Collide is the community where oil & gas professionals connect, share insights, and solve real-world problems together. No noise. No fluff. Just the discussions that move our industry forward.
Apply today at collide.io
https://twitter.com/collide_ai
https://www.tiktok.com/@collide.io
https://www.facebook.com/collide.io
https://www.instagram.com/collide.io
https://www.youtube.com/@collide_io
https://bsky.app/profile/collide-ai.bsky.social
https://www.linkedin.com/company/collideai