In this episode of Field Frequency, Jason Cortes sits down with Jeff Cohen, CEO of i-charging USA.
For most of the last decade, EV charging ran on one question: how many chargers did you deploy? That era is over. The questions now are harder — is the site profitable, is the infrastructure scalable, and when something breaks, how fast is it back online?
Jeff brings fourteen years in this industry — GE, ChargePoint, Tritium, and now a Portuguese DC charging manufacturer building out of Atlanta's Curiosity Lab. His read on the market comes down to three shifts. Profitability: the industry moved from land grab to site-by-site business case, and ROI now decides whether a site gets built at all. Serviceability: the old OEM question of "is it in warranty or out of warranty" was always the wrong question — the right one is whether the charger is operational and serviced on time. And scalability: fixed-output hardware forces operators to make kilowatts fit, while adaptive architecture sizes power to the site and grows with it.
The conversation gets specific fast. Jason shares a unit that sat dead for nine months — abandoned by its manufacturer, costing the operator $300–400 a month in a single parking space — and took a day and a half to fix once someone actually showed up. Jeff walks through what i-charging does at the site design stage, including an RFP where reading the e-sheets first saved a fleet depot roughly a million dollars in DC cable runs.
In this conversation:
CONNECT WITH JEFF
LinkedIn: Jeff Cohen
Web: https://i-charging.tech