Listen

Description

Utility teams still treat load forecasting as a regression against temperature and industrial schedules. This episode argues that world is gone. Rooftop solar can flip the sign of the weather relationship, a passing cloud can return 40 megawatts in 90 seconds, and a midnight EV rate discount can synchronize 10,000 chargers into a spike that never existed before. Bolting DER signals onto the old model produces a more complicated wrong answer.

You come away knowing where the money leaks, through NERC reliability reports and rate cases where a 2% error becomes a nine-figure conversation, why endogeneity breaks price-sensitive models, what probabilistic forecasting with confidence bands gives operators, and why dbt Labs style version control keeps models auditable without telling you they are wrong.

0:00 Why load forecasting stopped being solved
0:46 Rooftop solar flips the weather relationship
1:35 EV charging timers and rate-driven spikes
2:25 Forecast error in NERC reports and rate cases
3:30 Probabilistic forecasting and confidence bands
4:26 Audit your rate changes Monday morning