Pantheon Atlas has proposed a 1 GW AI campus in Topusko, Croatia: 800 MW of IT load, about €12 billion to start, and up to €50 billion over the life of the site. The episode asks why that hall is still a silicon factory, and what photonic, analog, neuromorphic, fluidic, chemical, and quantum machines can and cannot take its place in 2027.